#101condor The #hardieplank smooth finish siding is going up.
#101condor The #hardieplank smooth finish siding is going up. [igp-video src=""...
#101Condor shell is just about complete. Electrical, plumbing, and HVAC roughs get underway on Monday. #progress
#101Condor shell is just about complete. Electrical, plumbing, and HVAC roughs get...
The roof deck at #101Condor will be stunning. Featuring a full wet bar, grill, and outdoor TV it will be a great place for entertaining on those warm summer nights. To be completed late fall 2021. DM for inquiries.
The roof deck at #101Condor will be stunning. Featuring a full wet bar, grill, and...
#101Condor continues to go through exterior design refinements, but I think we have a winner. #jameshardie smooth plank siding in aged pewter along with black accent paneling. Pre-Construction units now available. DM for details.
#101Condor continues to go through exterior design refinements, but I think we have a...
The latest rendering and color schemes for this East Boston Development. Framing is well underway and pre-construction sales opportunities are right around the corner. #101condor
The latest rendering and color schemes for this East Boston Development. Framing is...
Updated renderings of our 101 Condor St. East Boston project that will hit the market in the fall of 2021. Features 17-2bd/2bh condos and 1-1bd/1bh condo with parking and a large roofdeck.. #realestatedeveloper #realestatedevelopment #eastbostonrealestate #eastbostondevelopment #newconstruction #bostonrealestatedevelopment #bostonrealestate #101condor #alpinepropertygroup
Updated renderings of our 101 Condor St. East Boston project that will hit the market...
Footings being poured for our 18 unit East Boston project!! #101condor @alpinepropertygroup
Footings being poured for our 18 unit East Boston project!! #101condor...
#705hammond On the market and ready to be sold!
#705hammond On the market and ready to be sold! [igp-video src=""...
Few progress pics from our 705Hammond st. project. Floors are going in this week and we’ll have a finished product
Few progress pics from our 705Hammond st. project. Floors are going in this week and...
#705hammond This beast is starting to take shape. As the interior walls go up, it’s the perfect time to make
#705hammond This beast is starting to take shape. As the interior walls go up, it’s...
#705hammond After a month of hammering ledge we poured the foundation and did some utility prep work. Lumber is onsite
#705hammond After a month of hammering ledge we poured the foundation and did some...